4 Laning of NH 544D from existing Km 346.300 of NH 44 (Design Chainage Km 0.000) to Km 39.380 (Design Chainage Km 37.000) of Anantapur – Muchukota section on Hybrid Annuity Mode under NH (O), in the State of Andhra Pradesh

Project Location Map

The Government of India had entrusted to the Authority the development, maintenance and management of 4 Laning of NH 544D from existing Km 346.300 of NH 44 (Design Chainage Km 0.000) to Km 39.380 (Design Chainage Km 37.000) of Anantapur – Muchukota section on Hybrid Annuity Mode under NH (O), in the state of Andhra Pradesh. Which shall be partly financed by the Concessionaire who shall recover its investment and costs through payments to be made by the Authority, in accordance with the terms and conditions set forth in the Concession Agreement entered into.

The Alignment of the project road starts at Km 0/000 of NH-544D (NH-44 near existing Km 346.300) and runs through nearby villages namely, Somaladoddi, Podaralla, Govindapalle, Janthuluru, Siddampeta, Bodigandidoddi, Chedulla, Peravali, Venkatampalle and ends near Muchukota at Km 37/000 of NH-544D. The total length of the project stretch is 36.846 Km. which runs through Anantapur.



M/s SRC Infra Developers Pvt. Ltd., has promoted and incorporated M/s SRC Infra Anantapur - Muchukota HAM Private Limited., a limited liability company as the Concessionaire to undertake and perform the obligations and exercise the rights of the selected bidder under the LOA for executing the project. The Concession Agreement (CA) between the concessionaire and NHAI was signed on 18.01.2023. The Concessionaire has achieved Financial Closure (FC) on 05.06.2023 and the Appointed Date was declared by the Authority as 23.07.2023.

The Concessionaire has appointed M/s SRC Infra Developers Pvt. Ltd., as the Engineering, Procurement and Construction (EPC) Contractor and signed EPC contract on 19.01.2023.

Global Infra Solutions Jv Artefact Projects Ltd. in association with MS Consultant, Bhopal Support staff of IE mobilized for supervision of regular project activities.

NHAI has appointed M/s ARMENGE Engineering Private Limited, Jaipur as the Safety Consultant for the Project.

Project Overview

Name of Work 4 Laning of NH 544D from existing Km 346.300 of NH 44 (Design Chainage Km 0.000) to Km 39.380 (Design Chainage Km 37.000) of Anantapur – Muchukota section on Hybrid Annuity Mode under NH (O), in the state of Andhra Pradesh.
Name of Employer National Highways Authority of India (NHAI) G-5 & 6, Sector-10, Dwarka, New Delhi -110075
Name of Concessionaire M/s SRC Infra Anantapur – Muchukota HAM Private Limited., Anantapuramu.
Independent Engineer/Support Staff of IE Independent Engineer/support staff of IE : M/s M/s SATRA Services and Solutions Pvt. Ltd. in JV with K&J Projects Pvt. Ltd. (Not yet Commenced)
EPC Contractor M/s SRC Infra Developers Private Limited.
Design Consultant M/s. Kaihatsu Design Consultants. No.C1, Ground Floor, Chitrakut Shelters, Dasarahalli Village, K.R.Puram Hobli, Bangalore East Taluk,Bengaluru,Karanataka-560024.
Senior Lender Union Bank of India
Length of Road (DesignLength) 36.846 Kms
Total Bid Project Cost Rs. 676.36 Crores (as per Concession Agreement)
Date of Concession Agreement 18.01.2023
Letter of Award Date 08.12.2022
Appointed Date 23.07.2023
Scheduled Completion Date 22.07.2025
Construction Period 730 Days (24 months)

Salient Project Features

4 - Lane Divided Carriage Way
Widening & strengthening existing 20.000 Kms
New realignment/bypass 16.846 Kms
Total Length of Project 36.846 Kms
Service Road/ Slip Road(LHS + RHS ) 34.060 Kms
Minor Bridge 13 Nos. (New-2+Wid-4+Reconstruction-3+Repair-4)
Major Bridges 01 Nos. (across Tadakaleru Vaagu)
Light Vehicular Underpass 07 Nos.
Vehicular Underpass 06 Nos.
Vehicular Over Pass Nil
Culverts (Pipe & Box) 67 Nos. (5 Nos. HPC+62 Nos. Box (3-wid, 23-New and 36-Reconstruction)
Major Intersections 01 Nos.
Minor Intersections 20 Nos.
Bus Bay & Bus Shelters 22 Nos. (18 Nos. Bus Shelters & 4 Nos. Bus Bay)
Retaining Wall (LHS + RHS) 8.402 Kms
RCC lined Drain(LHS + RHS) 37.170 Kms
Toll Plaza Nil
Truck Lay Bye Nil
ROB Nil
Project Financial Data
Bid Project Cost (INR) – (BPC) 676,36,00,000/-
Performance Security submitted as per the provisions of Concession Agreement – 3% of BPC (INR)- NHAI Policy Guidelines No: 3.1.27 dated 19.11.2020 20,29,00,000/-
Payment during Construction Period (INR) – 40% of BPC (INR) 270,54,40,000/-
Bonus on early completion (Article 23.5) 0.5% of 60% of Bid Project Cost for first 30 days.

Contractual Project Milestones as per – Schedule ‘G’ of C.A.

Following is a listing of the Key Project Milestones:

Milestone Description Target Date
Milestone-I Concessionaire shall expend not less than 20% of the Total capital cost and shall have commenced construction of the project and achieved 20% of physical progress on 150th day from the Appointed Date. 19.12.2023
Milestone-II Concessionaire shall expend not less than 35% of the Total capital cost and shall have commenced construction of the project and achieved 35% of physical progress on 330th day from the Appointed Date. 16.06.2024
Milestone-III Concessionaire shall expend not less than 75% of the Total capital cost and shall have commenced construction of the project and achieved 75% of physical progress on 510th day from the Appointed Date. 13.12.2024
Scheduled Completion Date Concessionaire shall have completed the Project on 730th day from the Appointed Date. 21.07.2025

Note: Appointed Date: 23.07.2023

Scope of Work

Schedule –B, Appendix B VI of Concession Agreement, the Proposed Right of Way (ROW) is of 30 meters,45 meters & 60 meters, details as under.

Sl. No. Design Chainage Length(m) Proposed ROW (m) Remarks
From To
1 0+000 8+260 8260 60
2 8+260 27+700 19440 45
3 0+000 8+260 8260 60
4 27+700 33+746 6046 30
5 33+900 37+000 3100 45

The Project Highway includes the Bypasses of length 8.100 Km and Realignment stretches of length 8.746 Km.

Bypasses

Sl. No. Design Chainage Length(m) Location
From To
1 0+000 8+100 8.100 Anantapur Bypass
Total Length in Km 8.100

Realignments

Sl. No. Design Chainage Length(m) Location
From To
1 8+700 9+100 0.400 Curve Improvement at Rotarypuram
2 9+800 10+400 0.600 Curve Improvement near Chedulla (near SRIT Collage)
3 14+500 15+600 1.100 Realignment at Singanmala Lake Section
4 27+700 33+746 6.046 Muchukota Reserved Forest Section
5 34+600 35+200 0.600 Curve improvement before Muchukota Village
Total Length in Km 8.746

The Project includes the construction of Service Road of length 4.600 Kms and Slip Road of length of 29.460 Kms.

Service Road

Sl. No. Design Chainage Length(m) Side Service Road Width (m)
From To
1 15+500 16+900 2.800 Both sides 7.50
2 26+300 26+800 1.000 Both side 7.50
3 26+800 27+600 0.800 Right side 7.50
Total Length in Km 4.600

Slip Road

Sl. No. Design Chainage Length(m) Side Slip Road Width (m)
From To
1 2+160 3+800 3.280 Both sides 7.50
2 4+500 4+820 0.640 Both sides 7.50
3 4+820 6+160 2.680 Both sides 7.50
4 7+180 10+740 7.120 Both sides 7.50
5 11+600 11+840 0.480 Both sides 7.50
6 11+840 13+400 3.120 Both sides 7.50
7 17+720 18+600 1.760 Both sides 7.50
8 18+600 19+000 0.800 Both sides 7.50
9 19+700 20+490 1.580 Both sides 7.50
10 20+490 21+230 1.480 Both sides 7.50
11 23+120 23+820 1.400 Both sides 7.50
12 24+660 25+600 1.880 Both sides 7.50
13 25+600 26+300 1.400 Both sides 7.50
14 35+620 36+540 1.840 Both sides 7.50
Total Length in Km 29.460

Structures: The project highway involves the construction of Vehicular Underpass (VUP), Light Vehicular Underpass (LVUP), Minor Bridges, Repair & Rectification of existing Minor Bridges, Major Bridge and Culverts at designed locations and same was listed as below.

Sl. No. Type Total No’s Remarks
1 VUP 06
2 LVUP 07
3 SVUP Nil
4 Vehicular Overpass Nil
5 Major Bridge 02 01 No. New construction & 01 No. Repair / Rehabilitation
6 Minor Bridge Reconstruction 03
New Construction 02
Widening 04
Repairs 04
7 Culverts Widening of Hump Pipe Culvert 05
Reconstruction of Box Culvert 36
New Construction of Box Culverts 23
Widening of Box Culvert 03

Intersections:

Sl.No Type Total No’s Remarks
1 Major Intersections 01 No’s
2 Minor Intersections 20 No’s

Project Facilities:

Sl.No Type of Facility Total Remarks
1 Toll Plazas Nil
2 Road Side Furniture
i) Traffic Signs Includes Roadside signs, Overhead Signs, Kerb Mounted Signs, etc. Shall be prepared as per the Manual requirements.
ii) Overhead Signs
iii) Pavement Marking Entire Project Highway As per Manual requirements.
iv) LED Traffic Beacons Entire Project Highway As per Manual requirements
v) Cat’s Eye / Road Studs Horizontal Curve below 700m, median opening, intersections, Cross roads & Built-up areas and shall confirm to the specifications mentioned in Schedule D.
vi) Delineators As per IRC 79 – 1981 and Schedule – D.
vii) Hectometre / Kilometre Stones Entire Project Highway As per Manual requirements.
viii) Safety Barrier W – Beam = 78.062 Km (all sides inclusive). MS railing as per TCS and manual requirements.
ix) Boundary Wall Provided on both side of ROW available of Project Highway
3 Highway Lighting Bus bays and shelter, Interchange with all Ramps, Grade separators including slip roads, built up sections, Major Bridge and At Grade Junctions. Solar Lighting at Junctions, interchanges with all Ramps.
4 Pedestrian Facilities As per Manual
5 Bus bays and Bus Shelters 22 Nos 4 Bus Bay & 18 Bus Shelters.
6 Landscaping and Tree Plantation
i) Tree Plantation 8780 Nos. As per the provisions of IRC SP – 21 and Manual requirements.
ii) Median openings 04 Nos As per Manual.
iii) Landscaping and tree plantation Including but not limited to the following – Grade Separated Intersections, Entry and Exit Ramps, At grade islands of intersection locations.Road Side, Bus bays on both sides of ROW, any other location as per requirements of Clause 11.3 of Manual.
7 Traffic Aid Posts Nil
8 Medical Aid Posts Nil
9 Vehicle Rescue Posts Nil
10 Utility Crossing / duct As per manual
11 Others
i) Advanced Traffic Management System (ATMS) As per Manual